6/23/99 |
Most shop walls up. Roof is up and
skylights are being cut in. Fire sprinklers finished
in office and going up in the shop.
|
![](Shop08.jpg) |
6/28/99 |
Inside walls of parapet up and
first show of color is up. Fire sprinklers in shop
almost completed and
electrical
subpanels are mounted on inside plywood sheathing.
|
![](Shop09.jpg) |
7/06/99 |
Metal roof for office is going up.
Fire sprinklers passed inspection and insulation is being
installed before the sheet rock goes up.
|
![](office15.jpg)
|
7/06/99 |
Electrical transformers, boxes and
panels are mounted and waiting for the wire to be
pulled.
|
![](Shop10.jpg)
|
7/19/99 |
Office sheetrock is up and being
taped. Parapet
almost completed. Roll doors and passage doors are up.
Lights are up and
we have power!
|
![](Shop11.jpg) |
8/04/99 |
Trees, shrubs & plants are
being planted. Final grade in process. Office doors are up and
walls are textured.
Final color-coat
of stucco has been applied.
|
![](Shop12.jpg) |